this thing is looking sick! whats being done at calgary autoworks?
Thanks!!
Lawrence is going to be doing the fabrication of all the intercooler piping, hooking up the downpipe to the exhaust system and just doing a general 'once over' to make sure everything looks good.
Today was a very productive day... I took pictures, I but don't have the camera with me :( ... I'll upload them soon.
-Engine is back in.
-Downpipe installed.
-Short runner installed.
-Fuel rail installed.
-Electrical is pretty much all hooked up (with the exception of the lights... the front rebar is still off the car.)
-Coolant hoses are in.
-Spark plug wires are in.
-Washer bottle back in
...ok... so you get the drift. I installed a lot today, only a little to go.
Still need to install:
-vacuum lines
-a/c lines & condenser
-radiator
-front rebar
-power steering reservior and pump
-alternator
-oil cooler
Sounds like a lot, but it's really not. Car should hopefully be good to go to Calgary Autoworks by the end of tomorrow night.
I picked up the engine from Lawrence in the afternoon and it didn't take long for Andrew and I to get started. I didn't take any pictures today, but we got the following bolted up / installed onto the engine...
I also heat wrapped the downpipe. We'll put that on tomorrow morning just before we drop the engine back into the car.
Hopefully by the end of tomorrow most of the big stuff is close to being done and it'll just be minor items to cleanup before it's sent off to Calgary Autoworks for the finishing touches.
Leave a comment: